WHKS prepared the site design for a new addition to the existing KRAFT manufacturing facility. The project included a topographic survey and design of an access road, retaining wall system, loading docks, and expansion of the existing storm sewer system. WHKS also designed a new wastewater lift station to serve the facility.
IMPROVING LIVES, BUILDING COMMUNITIES
During final design, it was determined that the retaining wall system could be eliminated by adjusting the overall grading plan and re-alignment of the access road, providing significant cost savings for the client.