WHKS provided construction services for the replacement of the existing Stonington Township Bridge carrying TR 216 over Buckhart Creek. The bridge was replaced with a single-span deck beam bridge with 42′-4″ back-to-back abutments, with 246-0″ out to out. The project included reconstruction of approximately 490 feet of the existing roadway on each side of the bridge and other related work.